KBR UK Technical Accommodation Project

The KBR UK Technical Accommodation project in EIA Camp Zorbash has been Planned, designed and build by Jana's professional team

(1) Construction of a Pavement Quality Concrete (PQC) foundation for a RES – number 1 priority works. (2) Relocation of a steel portal framed Dutch barn. (3) Relocation and reinstating of 4 No. existing cabins within the site boundary. (4) Relocation of the Texas barrier storage area. (5) Supply and install power generation, distribution system, and associated earth system, including fuel storage for generator. (6) Ground preparation for surface water drainage, French drain, and culvert construction. (7) Construction of a concrete road between the existing taxiway and RES foundation. (8) Retaining wall between the concrete road and the existing AM2 Aircraft Operating Surface (AOS). (9) Installation of 6 No. pits and associated ducts for communications.b. Technical accommodation - a second priority. As follows:(1) Supply and installation of 4 No. modular cabins. (2) Supply and install 1 No. western-style Ablution Unit with external emergency drench shower.c. Sitewide additional works - a third priority. As follows:(1) Construction of concrete hard-standings. (2) Construction of an aggregate track. (3) Installation of a perimeter fence with 2 No. vehicle gates. (4) Construction of a small-arms unloading bay. (5) Relocation of 2 No. Authority Supplied ISO containers, to include earthing arrangement. (6) Relocation of a separate cabin to a location within the site boundaries). (7) Laying of Authority supplied the ECO grid for pathways. (8) Laying of Dust Suppression (DS). (9) Construction of an anti-fragmentation barrier (HESCO 2:1 wall).(10) Crane hire, with operator & banksman, for 5 days. This is to assist the construction of the RES by an MCF.